Course Description
Introduction
The course offers a thorough analysis of the FSRU sector, covering many technical, project-specific, and business concerns related to the usage of FSRU regasification units.
Target Audience
This course is designed for:
· Technical, commercial, and management employees who need an in-depth technical knowledge of the LNG business and FSRU development. New technical support personnel entering the sector Technical personnel who want to learn more about the sector
Course OutlinesDay 1: Introduction to LNG – what is LNG:
· Some key facts about LNG, including physical properties, rich and lean LNG, composition ranges, safety, and flammability.
Day 2: LNG Global Trade and alternative Commercial Models:
· Global Gas and LNG Trade Development of LNG Trade LNG Importing Countries The Global FSRU Fleet Gas Market Characteristics The LNG Contract Chain Sales and Purchase Agreements FSRU Chartering
Day 3: Technical Fundamentals:
· LNG Properties and conversions Heating Values, Wobbe, Interchangeability, and market specifications
Day 4: FSRU vs Land Based Import :
· CAPEX Schedule Permitting Port Restrictions Major
Day 5: Major FSRU Technology Choices:
· Ragas Technology Selection Boil-Off Gas Handling/ Reliquefication LNG Pump Selection Topsides Layout Considerations
Day 6: FSRU Cargo Containment Systems:
· Overview of liquefaction systems (membrane vs Moss vs SPB vs Type C)
Day 7: LNG Transfer
· Ship to Ship Transfer- side by side vs tandem Hard Arms vs Cryogenic Hoses HP Gas transfer vs hard arms and HP hoses Custody Transfer, Metering and measurement Small scale and bunkering
Day 8: FSRU Mooring System Designs:
· Tower Yoke Systems Spread Mooring Offshore Island Jetty Mooring Gravity Based Regas structures
Day 9: Marine Infrastructure Issues:
· Breakwater Design Port Dredging Tugs and Pilots FSRU Designs Newbuild vs Conversions Shipyard Selection Ship Designs (AtlanticMax, Q-max, Q-flex) Floating Storage (FSU’s) Floating Regas (FRU’s) Floating Gas to Power Niche FSRU Applications
Day 10: FSRU Construction & Constructability:
· Long Lead Item Delivery Typical Conversion Schedule Typical Newbuild Schedule
· FSRU CAPEX and OPEX:
· Factors Influencing CAPEX and OPEX Typical OPEX Elements
· FSRU Site Selection Considerations:
· Metocean Water Depth Water Temperature Environmental Regulations
· Introduction to LNG Safety:
· Historical Incidents and Lessons learned – material selection, layout, stratification, rapid phase transition, other Safety in Design Safety Code requirements Introduction to Permitting and Environmental
