Course Description
Course Duration: Five Training Days
Course Language: Arabic or English
Include:
Scientific material with TAB
Workshops
Reception and farewell at the airport
Daily lunch
Coffee Break
Introduction
Coiled tubing (CT) has many programs within the petroleum industry, which encompass drilling (CT drilling), cementing, wellbore cleanup, oxidizing, and hydraulic fracturing. In contrast, the immoderate friction stress loss, because of the noticeably small tubing diameter and tubing curvature (which is assumed to be secondary to the drift) of CT, regularly limits the most available fluid injection rates. Therefore, it's of realistic significance to research the drift regularity and friction homes in CT
Targeted Groups
Engineers, Senior Operations Personnel, and Company Representatives with zero-to-intermediate well intervention knowledge who are assigned to evaluate, plan, and/or execute coiled tubing, slickline, or wireline interventions.
Course Objective
Plan, design, control and execute interventions for Coiled Tubing
Enhance operational overall performance for the duration of interventions for Coiled Tubing
Explain the encouraged system for diverse Coiled Tubing discipline situations and packages
Discuss the right stress management system for any unique situation
Learn approximately the maximum normally used downhill gear and give an explanation for its characteristics
Understand a way to calculate and outline string limits for Coiled Tubing
Learn a way to paintings accurately with liquid nitrogen
Course Content
Unit 1: Background
Coiled tubing technology historical improvement
CT package components, operational procedures and limitation,well control principles
Troubleshooting procedures
Hydraulic applications that involve circulation of fluids.
Mechanical services that involve the downhole conveyance of required tools or equipment.
Electrical services that employ downhole tools which are powered by or transmit through an electrical cable.
Completions; permanent applications with coiled tubing installed either as the producing conduit or part of it for flow control or other requirements (e.g. ESP conveyance).
Unit 2: Pumping services
Fluid displacement (nitrogen lifting)
Reservoir/well improvement (acid washing/stimulation)
Acid washing
Acid stimulation (matrix acidizing)
Fill cleanouts (sand removal/pressure jetting)
High pressure jetting
Remedial/abandonment (sand consolidation/cementing)
Chemical sand consolidation
Cementing
Unit 3: Work string
Drilling/milling
Undreaming (within cased hole)
Fishing
Coiled tubing slickline operations
Unit 4: Stiff wireline
Logging
Perforating
Downhole video camera
Unit 5: Completions
Production and velocity strings
Production strings
Injection strings
Tubing patches